Home healthcare firm built datacentre that saves on space, power, cooling and IT effort.

For years, Robert Wakefield and Dameon Rustin lived with the problems of keeping Snelling Staffing Service’s old, poorly designed datacentre up and running. Not only were the intricate cable runs and varied server makes and models difficult to keep straight, but the building itself tended to compound their management headaches.

“Our 15-ton air-conditioning unit was water-cooled, but the building [management] didn’t clean the cooling tower very often,” says Wakefield, vice president of IT at Snelling Staffing and Intrepid USA, a home healthcare firm also owned by Snelling’s parent firm, Patriarch Partners. “Muck would get in, clog up our strainers and shut down the AC unit to our datacentre. That was a big problem.”

In addition, the building owners would not give Snelling the OK to put in a diesel backup generator to power the datacentre. “Let’s just say they weren’t very helpful,” says Wakefield, who spoke about his datacentre project at the recent Network World IT Roadmap Conference and Expo in Dallas.

Things began to change quickly once Patriarch bought up Intrepid in 2006. Wakefield and Rustin, Snelling’s director of technology, were charged with building a brand-new datacentre that would not only solve the current Snelling problems, but also house Intrepid’s datacentre and be ready to support any future growth.

“We had to build expandability into it because Patriarch is a private investment firm, and their goal is to buy more companies and roll them in,” Wakefield says. “We were told to give ourselves about 100 percent growth room.”

The downside? They needed to do all that with a budget of $800,000 and a window of only six months. “It was a challenge,” Wakefield says.

But it was a challenge they met head-on. Today, Snelling and Intrepid’s new 1,100 square foot datacentre in Dallas efficiently houses a variety of equipment, including:

  • A total of 137 servers (45 for Intrepid and 92 for Snelling), 37 of which are new dual-core, dual-AMD Opteron processor-based Sun Fire X-series Unix servers.

  • Three EMC storage systems, including an EMC CX400, a CX3-20 iSCSI system and an old SC4500, as well as a Quantum tape library.

  • A variety of networking components, including shared virus scanners and Web surfing control appliances.

  • A Liebert 100kVA uninterruptible power supply (UPS).

  • Two Emerson 10-ton and one Emerson 15-ton glycol-based AC units.

And even with all of that, Wakefield says he still has room to add nine more server racks.

Getting there

Wakefield and Rustin first visited several datacentres to get an idea of what could and could not be done. They also looked at a number of different locations before deciding in January on the Dallas building. Then, the real planning began.

“Once we had the dimensions, everything else came from that,” Wakefield says. He and Ruston drew up 10 different floor plans and began calculating how many servers they’d need, and how much cabinet space. At that point, requirements began to fall into place. “High-density became a requirement; virtualisation became a requirement,” he says.


What are your views on this subject? Use the form below to post a comment on this article up to 500 characters.


Characters remaining: 500

Related Operating Systems news

Microsoft may move up Windows 7 service pack release

Rumours say SP1 might appear before the end of the year

Google reveals Chrome OS security details

Locked down with Trusted Platform Module

Microsoft Office 2010 to launch 12 May

Free upgrade offer runs until 30 September

Windows needs patching every five days

Typical home users face "unreasonable" burden



Email this article to a friend or colleague:


PLEASE NOTE: Your name is used only to let the recipient know who sent the story, and in case of transmission error. Both your name and the recipient's name and address will not be used for any other purpose.

Techworld White Papers

Email archiving: Top 10 myths and challenges

This survey looks at a number of challenges and myths around email archiving that may also slow adoption of full archiving.

Download Whitepaper

Strategic mobile deployments

Deploying mobile applications? Supporting multiple devices? See why mobile platforms should be part of your IT strategy.

Download Whitepaper

Creating an AUP: Common myths & mistakes

Avoid the common myths & mistakes when implementing your AUP

Download Whitepaper

Legal risks of uncontrolled email and web use

Exploring the challenges facing IT Mangers today and vital steps to ensure safe internet an email use by employees.

Download Whitepaper

Techworld UK - Technology - Business

COLT White Paper

Virtualisation 2.0
Driving to higher ground beyond the basics

Virtualisation can deliver unparalleled efficiency and cost reductions to your business, allowing direct access to servers and guaranteeing a dependable, rapid response in times of crisis. Read this e-book to learn more about consolidation, discover the latest technologies and find out how to reduce the TCO of virtualisation.

Download E-Book
COLT White Paper

IT Misuse Survey

Complete this survey and you could win a Nexus One

Techworld are running a short survey to discover how UK businesses are managing Internet and email misuse in the Enterprise.

Complete Survey

Webcast: IT Financial Management: Cost Optimisation for Efficiency and Agility.
On Demand Webcast
Join this webcast to learn about the techniques and technologies that can help you prove the value of IT to the business by understanding the true cost of today's IT services and those that will be necessary to deliver future success.

Register Today

Site Map

IDG Network

* *